Diagramming glossary
Plain definitions for the diagramming and lean process terms that come up most often, each one written to stand on its own.
- BPMN (Business Process Model and Notation)
- BPMN is a standardised notation for modelling business processes, maintained by the Object Management Group. It defines a precise vocabulary of events, activities, gateways and pools so that a process diagram means the same thing to every reader, and can be handed to a workflow engine for execution.Use BPMN when a process must be unambiguous across teams or automated. Use a plain flowchart when the audience is human and the goal is comprehension.Read more →
- Cycle time
- Cycle time is how long one unit of work takes to pass through a single process step, measured from the moment work starts on it to the moment it is handed on. It excludes time the work spends waiting before or after that step.Read more →
- Fishbone diagram (Ishikawa)
- A fishbone diagram, also called an Ishikawa or cause-and-effect diagram, arranges the possible causes of one problem into categories along a spine pointing at the problem. Its purpose is to force breadth before depth, so that investigation does not settle on the first plausible cause.Read more →
- Flowchart
- A flowchart is a diagram showing a process as a sequence of steps connected by arrows, with a small shape vocabulary distinguishing actions, decisions, inputs and terminators. It answers what happens and in what order, but does not show how long work waits between steps.Read more →
- Kanban
- Kanban is a scheduling method in which downstream consumption signals upstream replenishment, so work is pulled rather than pushed. On a value stream map the kanban signal is drawn explicitly, because replacing a forecast-driven push with a consumption-driven pull is one of the most common future-state changes.Read more →
- Lead time
- Lead time is the total elapsed time from a customer request to its delivery, including every period the work spends waiting. It is the figure the customer actually experiences, and it is usually many times larger than the sum of the cycle times.Read more →
- Process-cycle efficiency
- Process-cycle efficiency is value-adding time divided by total lead time, expressed as a percentage. It is read off the timeline at the bottom of a value stream map, and first measurements of an unimproved process commonly fall below 10%.Read more →
- Swimlane diagram
- A swimlane diagram is a process diagram divided into parallel lanes, each owned by one role, team or system, with each step placed in the lane responsible for it. Its value is that every handoff between lanes becomes visible, and handoffs are where most delay and most lost work originate.Read more →
- Takt time
- Takt time is the rate at which a process must complete units in order to meet customer demand, calculated as available working time divided by units demanded in that time. It is a target set by demand, not a measurement of current performance.Read more →
- UML (Unified Modeling Language)
- UML is a standardised notation for modelling software systems, covering both structure (class and component diagrams) and behaviour (sequence, state and activity diagrams). It describes systems rather than business processes, which is the main line between UML and BPMN.Read more →
- Value stream map (VSM)
- A value stream map is a lean diagram showing every step required to take a product or service from customer request to delivery, together with the information flow that schedules each step and the time work spends waiting between steps. Its purpose is to separate value-adding time from total lead time so improvement effort targets the delay rather than the steps.Full guide: how to build one, the standard symbols, and current vs future state.Read more →
- Waste (the seven wastes)
- In lean practice, waste is any activity that consumes resources without adding value the customer would pay for, conventionally grouped into seven kinds: waiting, inventory, transport, motion, over-processing, overproduction and defects. Waiting and inventory are the two a value stream map is uniquely suited to exposing.Read more →
Draw any of these in Value Charts
Value stream maps, BPMN, swimlanes, fishbone and UML: one canvas, with AI to draw the first draft.
Start freeNo credit card required.